Type of Compliance Verification Activity: Inspection sur le terrain

Activity #: 1516-306
Activity start: 10/13/2015
Activity End: 10/14/2015

Related Activity Numbers:

Inspection Officer Number(s): 0994

Incident #:
Landowner Complaint File #:

Company: Venturion Oil Limited

Facility Name(s): Inspected 4 Venturion Oil Ltd. pipeline systems in the Boundary Lake area AB/BC border. Three active pipeline systems and one abandoned pipeline

Active 14 29 85 13W6 to 13 28 85 13W6
Abandoned 10 28 85 13W6 License # 280178 AB and 280323

Province(s):

Theme(s): Damage Prevention

Compliance Tools Used:

Purpose

This activity was undertaken to verify compliance with the following regulatory requirements.

 X  NEB Act

 X  Onshore Pipeline Regulations

 X  CSA Standard Z662 Oil and Gas Pipeline Systems

    Other:

    Electricity Regulations

    Processing Plant Regulations

 X  Pipeline Crossing Regulations Part I

    Pipeline Crossing Regulations Part II

Observations & Discussion

Observations & Discussion
Date visited Location Theme Compliance Confirmed
14-Oct-15
14 29 85 13W6M Damage Prevention Yes

Observations

RoW well maintained. The RoW was clear and free from brush. Signage was located at the appropriate locations and also had the required information which indicated the company name, warning, type of commodity and emergency number.

-Pipeline is inspected twice a year, spring and fall. Crews are also on site daily walking the RoW.

-Reviewed Venturions O&M Crossing Agreements and Public Awareness Program and appear to be adequate. Venturion has not been involved with any crossing activity for this location.

-No unauthorized activity to report in the area. Pipeline RoW is on crown land.

-RoW is on crown land and Venturion Oil works with the Ban Tribes on their Public Awareness program either by face to face or mail. Some Ban Tribes work with Venturion Oil.

Observations & Discussion
Date visited Location Theme Compliance Confirmed
15-Oct-15 10 25 85 13W6M Damage Prevention No

Observations

Observed a Venturion Oil abandoned pipeline with old signage from the previous owner. Venturion Oil is requested to have the signs updated with the new owners information located at 10 28 85 13W6 as required by CSA Z662 15
Clause
10.5.3.3
Signs shall include the following information, printed on a background of sharply contrasting colour:
a) the word “Warning”*, “Caution”*, or ”Danger”* prominently displayed, in 25 mm high, bold lettering;
b) the type of pipeline system, such as “High-Pressure Natural Gas Pipeline”†, prominently displayed in 13 mm high bold lettering; and
c) the name of the operating company and emergency notification information, including an emergency telephone number with area code.
* The equivalent French wording is “Avertissement“, “Attention”, or “Danger“, respectively.
† The equivalent French wording is “Canalisation de gaz naturel à haute pression“.
Note: It is recommended that
a) signs include a statement such as “Call before you dig” (equivalent French wording: “Téléphoner avant de creuser”) or “Call for locate” (equivalent French wording: “Téléphoner pour repérer“); and
b) consideration be given also to including the required information in a language appropriate to the region in which the sign is located.

Signs missing on both sides of the road on the abandoned pipeline and is required as per CSA Z662 15
Clause
10.5.3.1
Signs shall be installed to identify the presence of pipelines to reduce the possibilities of damage and interference. Such signs shall be posted along pipeline rights-of-way, as applicable, as follows:
a) at railway and road rights-of-way; and
b) at strategic areas of
i) utility corridors;
ii) subdivision development;
iii) construction activity;
iv) drainage systems;
v) irrigation systems; and
vi) other anticipated third-party activity.


Compliance Summary

Compliance Summary
Theme Compliance Tools Used Corrective Action Due Date
Damage Prevention   12/18/2015
Date/Time visited Location
10/15/2015 2:25:32 PM 10 25 85 13W6M

Observations

Observed a Venturion Oil abandoned pipeline with old signage from the previous owner. Venturion Oil is requested to have the signs updated with the new owners information located at 10 28 85 13W6 as required by CSA Z662 15
Clause
10.5.3.3
Signs shall include the following information, printed on a background of sharply contrasting colour:
a) the word “Warning”*, “Caution”*, or ”Danger”* prominently displayed, in 25 mm high, bold lettering;
b) the type of pipeline system, such as “High-Pressure Natural Gas Pipeline”†, prominently displayed in 13 mm high bold lettering; and
c) the name of the operating company and emergency notification information, including an emergency telephone number with area code.
* The equivalent French wording is “Avertissement“, “Attention”, or “Danger“, respectively.
† The equivalent French wording is “Canalisation de gaz naturel à haute pression“.
Note: It is recommended that
a) signs include a statement such as “Call before you dig” (equivalent French wording: “Téléphoner avant de creuser”) or “Call for locate” (equivalent French wording: “Téléphoner pour repérer“); and
b) consideration be given also to including the required information in a language appropriate to the region in which the sign is located.

Signs missing on both sides of the road on the abandoned pipeline and is required as per CSA Z662 15
Clause
10.5.3.1
Signs shall be installed to identify the presence of pipelines to reduce the possibilities of damage and interference. Such signs shall be posted along pipeline rights-of-way, as applicable, as follows:
a) at railway and road rights-of-way; and
b) at strategic areas of
i) utility corridors;
ii) subdivision development;
iii) construction activity;
iv) drainage systems;
v) irrigation systems; and
vi) other anticipated third-party activity.

Regulatory Requirements

Signs to be updated on the abondand pipeline RoW and roadway, 10 28 85 13W6 as required by CSA Z662 15
Clause 10.5.3.1 and 10.5.3.3
10.5.3.1
Signs shall be installed to identify the presence of pipelines to reduce the possibilities of damage and interference. Such signs shall be posted along pipeline rights-of-way, as applicable, as follows:
a) at railway and road rights-of-way; and
b) at strategic areas of
i) utility corridors;
ii) subdivision development;
iii) construction activity;
iv) drainage systems;
v) irrigation systems; and
vi) other anticipated third-party activity.

10.5.3.3
Signs shall include the following information, printed on a background of sharply contrasting colour:
a) the word “Warning”*, “Caution”*, or ”Danger”* prominently displayed, in 25 mm high, bold lettering;
b) the type of pipeline system, such as “High-Pressure Natural Gas Pipeline”†, prominently displayed in 13 mm high bold lettering; and
c) the name of the operating company and emergency notification information, including an emergency telephone number with area code.
* The equivalent French wording is “Avertissement“, “Attention”, or “Danger“, respectively.
† The equivalent French wording is “Canalisation de gaz naturel à haute pression“.
Note: It is recommended that
a) signs include a statement such as “Call before you dig” (equivalent French wording: “Téléphoner avant de creuser”) or “Call for locate” (equivalent French wording: “Téléphoner pour repérer“); and
b) consideration be given also to including the required information in a language appropriate to the region in which the sign is located.

Corrective Action or Request Required

NEB inspector requires notification, in writing and photographic evidence, no later than December 18, 2015 to confirm that the signage has been replaced to reflect the current owner and that missing signage on the roadway is installed, location 10 28 85 13W6.

Compliance Summary
Theme Compliance Tools Used Corrective Action Due Date
    10/30/2015
Date/Time visited Location
10/15/2015 2:52:53 PM  

Observations

 

Regulatory Requirements

Signs missing on both sides of the roadway of the abandoned pipeline, location 10 28 85 13W6 is required as per CSA Z622 15
Clause
10.5.3.1
Signs shall be installed to identify the presence of pipelines to reduce the possibilities of damage and interference. Such signs shall be posted along pipeline rights-of-way, as applicable, as follows:
a) at railway and road rights-of-way; and
b) at strategic areas of
i) utility corridors;
ii) subdivision development;
iii) construction activity;
iv) drainage systems;
v) irrigation systems; and
vi) other anticipated third-party activity.

Corrective Action or Request Required

 

This notice reflects the observations of non-compliance with regulatory requirements or company commitments, made by the inspection officer during the compliance verification activity. If the corrective actions identified are implemented by the completion date, the matter is considered resolved. Any unresolved compliance matters will be addressed by the inspection officer and may be referred to NEB enforcement staff.

517 Tenth Avenue SW Calgary, Alberta  T2R 0A8
Telephone: 403-292-4800   Toll Free: 1-800-899-1265

 

Date modified: