Board Letter and Order

Order
Number
Related
Documents
Last Updated
(yyyy-mm-dd)
Recipient Region/
Facility
Description

SG-C293-01-2011

2012-09-18

Centra Transmission Holdings Ltd. Birmingham (MI), USA Non-compliance with Board Order

SG-T201-002-2011

2011-10-28

TransCanada PipeLines Limited, on behalf of Trans Québec & Maritimes Pipeline Line 2000 Pipeline anomalies

SO-E102-002-2011

2013-13-22

Enbridge Pipeline (NW) Inc. Norman Wells to Zama Pipeline (Line 21), at Willow Lake River (NT) Release of crude oil

SO-P384-004-2011

2011-12-01

Plains Midstream Canada Milk River (AB) and the Wascana (SK) crude oil mainlines Issues from 2009 audit

OF-Surv-Gen 01

2012-08-24

Enbridge Pipeline Inc. Edmonton (AB) NEB to inspect Control Centre

SG-C293-002-2012

2014-06-11

Centra Transmission Holdings Ltd. Birmingham (MI), USA Non-compliance with Board Order

SG-W102-001-2012

2012-09-18

Westcoast Energy Inc. carrying on business as Spectra Energy Transmission (Westcoast) Nig Creek Pipeline (BC) Pipeline rupture

SO-K077-005-2012

2012-12-21

Kinder Morgan Cochin Pipeline System Stress Corrosion Cracking failure on US system

SO-T241-002-2012

2014-06-04

TransCanada PipeLines Limited (TransCanada) on behalf of TransCanada Keystone Pipeline GP Limited (Keystone) Portage La Prairie, Rapid City, Moosomin and Richardson (MB, SK) Lack of alternate power source for pump stations

CO-001-2013

2013-10-18

Imperial Oil Resources Ltd. Norman Wells Production Facility (NT) Flowline Leaks

SG-D081-01-2013

2014-04-15

DR Four Beat Energy Corp. Knappen Border Pipeline and associated facilities (AB) Failure to file an Emergency Procedures Manual; inadequate emergency signage and contact information

SG-N081-001-2013

2014-12-18

TransCanada PipeLines Limited NOVA Gas Transmission Ltd. Grande Prairie Mainline Loop (Elmworth Section) (AB) Pipeline anomaly

SG-N081-004-2013 & SG-N081-005-2013

2013-12-20

NOVA Gas Transmission NPS 8 Mitsue Lateral and NPS 6 Ukaltal Lateral (AB) Gas Leaks

SG-N081-006-2013

2013-12-20

NOVA Gas Transmission NPS 24 North Lateral Extension Loop (AB) Gas Leak

SG-T211-003-2013

2013-08-30

TransCanada PipeLines Limited Compressor stations (ON, SK, AB) Incidents involving a fire or an explosion in compressor/meter stations in 2009, 2011 and 2012

OA-1204-003-2013

2013-02-15

Husky Oil Operations Ltd. Husky Little Bear wells and facilities (NT) Health and safety issues at work camp

SO-E101-001-2013

2013-05-02

Enbridge Pipeline Inc. System wide Emergency back-up power and push button shut down keypads at pump stations

SO-E101-002-2013

2013-05-23

Enbridge Pipeline Inc. System wide Cracking incidents

SO-E101-003-2013

2013-06-17

Enbridge Pipeline Inc. Edmonton Control Room Regulatory requirements

SO-E101-004-2013

2013-06-03

Enbridge Pipeline Inc. Edmonton Terminal (AB) Overpressure incidents

SO-T217-003-2013

2013-08-29

Trans-Northern Pipelines Return to Full Pressure from Montreal to Farran’s Point Integrity Management Program - Application to Increase Pressure Pursuant to Safety Order SO-T217-03-2010

SO-T260-005-2013

2014-10-24

Kinder Morgan Canada Inc. Trans Mountain Pipeline NPS 24 Mainline - Liquids Leak

GPLO-C298-003-2014

2014-04-21

Canadian Natural Resources Limited (CNRL) Ladyfern Pipeline (AB) Unsupervised hydrostatic test

OC-062-2015

2015-01-23

Enbridge Pipelines Inc. Edmonton to Hardisty Pipeline Project (AB) Application for a Variance of the Certificate to Allow for Modifications to the Project Specifications

OPLO-K077-004-2014

2014-07-16

Kinder Morgan Elmore, Saskatchewan, Fort Saskatchewan, Alberta Portion Cochin Pipeline System Reversal Project

SG-N081-001-2014

2016-01-25

NOVA Gas Transmission Canada Restriction on return to service

SG-T211-002-2014

2014-04-17

TransCanada Pipelines Limited Canadian Mainline Line 100-4 at MLV 2 + 3.3 km near Burstall (SK) Engineering Evaluation for Temporary Pressure Reduction Relaxation

SG-W102-003-2014

2014-05-28

Westcoast Energy Inc. carrying on business as Spectra Energy Transmission (Westcoast) Nig Creek Pipeline (BC) Gas release

SO-P384-001-2014

2014-03-17

Plains Midstream Canada Milk River (AB) and the Wascana (SK) crude oil mainlines Pressure restriction on oil mainline

M0-066-2015

2015-11-12

Enbridge Pipelines (NW) Inc. British Columbia Requesting Approval to Modify Two Requirements Of Safety Order SO-E102-002-2011, as Amended Revision to NEB Letter Dated 16 November 2015 and Order Approved 12 November 2015

SG-N081-001-2015

2015-05-21

NOVA Gas Transmission Western AB System Mainline, Airdrie (AB) Change of Class Location

SG-W102-002-2015

2016-07-15

Westcoast Energy Inc. (Spectra Energy Transmission) Canada Address a number of concerns with respect to the operations at Westcoast’s processing plants and facilities

SO-P384-001-2015

2015-01-15

Plains Midstream Canada ULC Canada 2010 Operational Audit - Implementation of Safety Management and Environmental Protection Program Corrective Actions

Letter

2015-03-04

Enbridge Pipelines Inc. Line 9B Reversal and Line 9 Capacity Expansion Project, Westover to Montreal Terminal Request for information on use of Non-Disclosure Agreements regarding Emergency Information
Letter [PDF]
  • Canadian Energy Pipeline Association Letter
2015-05-02   Non-Disclosure Agreements for Emergency Procedures Manuals  

MO-020-2016

2016-05-24

TransCanada Keystone Pipeline GP Ltd. (AB) Field Inspection, Environmental Protection CVA 1516-431

SO-P384-001-2016

2016-02-11

Plains Midstream Canada ULC Ontario Windsor Sarnia Pipeline Reactivation
Order MO-011-2012 (Order)
Plains’ Final Reports pursuant to Conditions 4, 5 and 6 of the Order

AO-001-SO-T217-03-2010

2017-09-08

Trans-Northern Pipelines Inc Canada Overpressure and Pipeline Exposure Incidents

XG-C357-09-2010

2014-08-07

Lone Pine Resources Canada Ltd. Ojay Pipeline Variance to Order XG-C357-009-2010. Failure to comply with Condition 15 of Order XG-C357-09-2010

XO-T260-009-2013

2014-05-08

Trans Mountain Pipeline ULC (Kinder Morgan Canada) Edmonton (AB) Order XO-T260-009-2013 - Leave to Open Application

XG-N081-021-2013

2014-04-28

NOVA Gas Transmission Musreau Lake West Receipt Meter Station Order XG-N081-021-2013 - NGTL Application for Leave to Open

OF-Surv-Inc-2012 81

2012-09-07

Westcoast Energy Inc. carrying on business as Spectra Energy Transmission (Westcoast) Nig Creek Pipeline (BC) Pipeline rupture / restriction on Return to Service

OF-Surv-Inc-2013 110

2012-09-07

Westcoast Energy Inc. carrying on business as Spectra Energy Transmission (Westcoast) Nig Creek Pipeline (BC) Pipeline rupture / restriction on Return to Service

 

Date modified: