Proposed Damage Prevention Regulations - Draft Guidance Notes - February 2009 [PDF 369 KB]
File NEBA-RRG-DPR 01
9 February 2009
To: All Interested Stakeholders
National Energy Board Proposed Damage Prevention Regulations and Draft Guidance Notes, February 2009 Comment Period
The National Energy Board (the Board or the NEB) is working on Proposed Damage Prevention Regulations (Proposed DPR) that will replace the National Energy Board Pipeline Crossing Regulations, Part I and the National Energy Board Pipeline Crossing Regulations, Part II.
The Proposed DPR will apply to NEB regulated pipeline companies and to any person planning or undertaking an activity with the potential to damage pipelines regulated by the Board. The purpose of the Proposed DPR is to:
The Board has made several changes to the 2004 draft of the Proposed DPR since it was originally circulated for review. Therefore, the Board has decided to provide another opportunity for interested stakeholders to comment on the Proposed Damage Prevention Regulations and Draft Guidance Notes, February 2009. This document is included for your review and comment.
In addition, the Board launched its Land Matter Consultation Initiative (LMCI) in October 2007, and consultations across Canada were initiated. The summary of issues raised and proposed actions are included in a Draft LMCI Report released on 16 December 2008 (Draft Report). As part of the Draft Report, the Board indicated its intention to incorporate the requirement for companies to have a program in place to manage the movement of vehicles and mobile equipment in the Proposed DPR. This information can be found in the draft LMCI Report, Action 1.2 in Appendix 1 on the NEB Website at www.neb-one.gc.ca by selecting the blue Land Matters Consultation Initiatives icon on the right-hand side of the home page. The Board invited comments on the LMCI Report by 20 February 2009. The Board would like to draw your attention to section 4 of the Proposed DPR which relates to this aspect of the 16 December 2008 draft LMCI Report.
During the development of the Proposed DPR, a number of industry and landowner groups expressed interest in meeting with Board once the documents were publicly available for comments. Accordingly, the Board plans to follow up with Canadian Alliance of Pipeline Landowners' Associations (CAPLA), Canadian Association of Petroleum Producers (CAPP), Canadian Energy Pipeline Association (CEPA), and Union des producteurs agricoles (UPA) shortly to discuss the possibility of such meetings.
Providing Written Comments on the Proposed DPR and Draft Guidance Notes
Written comments on the proposed DPR and Draft Guidance Notes can be provided before Friday, 20 March 2009 to:
Claudine Dutil-Berry,
Secretary of the Board
National Energy Board
444 Seventh Avenue S.W.
Calgary, Alberta T2P 0X8
Email: damageprevention@neb-one.gc.ca
Facsimile 403-292-5503 or 1-877-288-8803
Please include the subject title "Proposed Damage Prevention Regulations and Draft Guidance Notes, February 2009" in your correspondence. Written submissions will be posted on the Board's website.
To learn more about the proposed DPR, please see the attached Frequently Asked Questions. This letter and the attached documents can be found online at www.neb-one.gc.ca by clicking on "Acts and Regulations", selecting "Regulations Under Review" and scrolling down to "Damage Prevention Regulations (Pipeline Crossing Regulations)".
For more information please contact the Project Managers Chantal Briand at 403-292 4192 or Scott Gedak at 403-299-3674, or toll free at 1-800-899-1265.
The Board appreciates the continued involvement of interested stakeholders in this project. For updates regarding the proposed DPR, please visit the Board's website at www.neb-one.gc.ca.
Yours truly,
Claudine Dutil-Berry
Secretary of the Board
Attachments
Proposed Damage Prevention Regulations - Draft Guidance Notes
February 2009
National Energy Board Act (Act)
Proposed Damage Prevention Regulations (DPR)
Onshore Pipeline Regulations, 1999 (OPR)
Onshore Pipeline Regulations, 1999, Guidance Notes
American Public Works Association Uniform Colour Code
Canadian Association of Pipeline and Utility Locating Contractors
CSA Z662 Oil and Gas Pipeline Systems (CSA Z662-07)
National Energy Board's Filing Manual
Ontario Regional Common Ground Alliance Best Practices (ORCGA)
The National Energy Board (the NEB or the Board) regulates natural gas, oil and commodity pipelines that cross a provincial or international border. The NEB is committed to ensuring the continued safe and reliable operation of Canada's pipeline infrastructure that fall under its jurisdiction.
The NEB's Proposed Damage Prevention Regulations (DPR) apply to any pipeline company and to any person planning or undertaking an activity that has the potential to damage pipelines regulated by the NEB.
Guidance Notes provide the text of the DPR followed by the Board's enacted authority (refer to Appendix 1 - Legislative Authority) and guidance pertinent to the section(s) of the DPR cited. Guidance Notes do not contain mandatory requirements unless they repeat or paraphrase the requirements of the DPR. Guidance is intended to provide additional information that will assist readers in understanding their regulatory obligations and the NEB's expectations.
To assist in comprehension and understanding, the document includes numerous explanatory text boxes under the heading "Did You Know". These boxes are used to convey important information that may assist readers in making sound decisions regarding compliance and safety.
The DPR and Guidance Notes are based upon the following statement of purpose and three supporting principles.
Statement of Purpose
The Board regulates activities on or adjacent to pipelines under its jurisdiction in the interests of the safety of persons, the protection of property and the environment[1].
[1] The Board's goals are:
Supporting Principles
The DPR reflect the Board's continued advancement in the development and implementation of goal oriented regulations. As such, a key component of the DPR is the ability to assess compliance through audits of pipeline company records, practices, and procedures. The onus is on individual companies to implement and demonstrate compliance with the DPR, which is assessed through NEB field inspections and auditing management systems.
The following definitions are included in the National Energy Board Act (Act) to which there are references in the DPR:
| Company | Includes,
|
| Pipeline | Means a line that is used or to be used for the transmission of oil, gas or any other commodity and that connects a province with any other province or provinces or extends beyond the limits of a province or the offshore area as defined in section 123, and includes all branches, extensions, tanks, reservoirs, storage facilities, pumps, racks, compressors, loading facilities, interstation systems of communication by telephone, telegraph or radio and real and personal property, or immovable and movable, and works connected to them, but does not include a sewer or water pipeline that is used or proposed to be used solely for municipal purposes. (pipeline) |
| Utility | Means a navigable water, a highway, an irrigation ditch, a publicly owned or operated drainage system, sewer or dike, an underground telegraph or telephone line or a line for the transmission of hydrocarbons, electricity or any other substance. (installation de service public) |
The following terms appear throughout the DPR and/or Guidance Notes and are understood to mean:
| Backfill | The act of filling the void created by excavating or the material used to fill the void (as defined in the Ontario Regional Common Ground Alliance Best Practices Version 4.0 - March 2008). (remblayage) |
| CSA Plus 663 | “CSA Plus 663” means CSA Plus 663 entitled Land Use planning for pipelines: A guideline for local authorities, developers, and pipeline operators. (CSA Plus 663) |
| CSA Z662-07 | "CSA Z662-07" means CSA Standard Z662 entitled Oil and Gas Pipeline Systems, as amended from time to time. (CSA Z662-07) |
| Easement Agreement | An agreement under which a company acquires the right to use the land for the pipeline. It is a written contract that sets out the rights of the company and rights of the landowner for the use of the right-of-way. (accord de servitude) |
| Excavation | Any operation within 30 metres of the pipeline using power-operated equipment or explosives used in the movement of earth, rock or other material below existing grade. (excavation) |
| Facility | Includes a pipeline and means: (a) any structure that is constructed or placed on the right-of-way of a pipeline; and (b) any highway, public or private road, railway, irrigation ditch, drain, drainage system, sewer, dike, berm, communications cables or line for the transmission of hydrocarbons, power or any other substance that is or is to be carried across, along, upon or under any pipeline. (installation) |
| Ground disturbance | Any work, operation or activity on or under the existing surface resulting in a disturbance or displacement of the soil or ground cover. (remuement du sol) |
| Locate (verb) | The process of a pipeline owner/operator or their agent providing information to an excavator which enables them to determine the location of an underground facility. (localiser) |
| Locate (noun) | The provision of location information by an underground facility owner (or their agent) in the form of ground surface markings and/or facility location documentation such as drawings, mapping, numeric descriptions or other written documentation (as defined in the Ontario Regional Common Ground Alliance Best Practices Version 4.0 - March 2008). (localisation) |
| Locate report | A record of a locate. (rapport de localisation) |
| Locate request | A communication between a person proposing to excavate or disturb the ground at a particular location and a one-call centre, the pipeline company or their agent in which a request for locating underground facilities is processed. (demande de localisation) |
| Locate ticket | A locate ticket is a one-call centre and/or pipeline company's record of a locate request that is transmitted to potentially affected members of the one-call centre, advising them of a proposed activity and requesting that they identify and, where appropriate, mark the location of their buried facilities at the site of the proposed activity. (bordereau de localisation) |
| Locator | A person who has been qualified by the pipeline company to perform a locate. (localisateur) |
| Marking | Activities involved in visibly identifying the location of buried facilities through means of temporary flags, spray paint or other appropriate means. (jalonnement) |
| ORCGA | Ontario Regional Common Ground Alliance Best Practices is a non-profit organization dedicated to shared responsibility in damage prevention and in the promotion of damage prevention Best Practices. (ORCGA) |
| Person | Any individual or legal entity, public or private. The term "any person" as stated in the DPR includes, but is not limited to: a landowner, resident, tenant, excavator, contractor, business, association and pipeline companies and their agents. (personne) |
| Pipeline Company | A company or its designate, responsible for the operation of the pipeline. (compagnie pipelinière) |
| Right-of-Way | The strip of land acquired for which a pipeline company has obtained the rights for the construction and operation of the pipeline. Figure 1 (under section 1, page 2) provides a graphical depiction of a right-of-way. (emprise) |
[2] This proposed text is provided solely for information purposes and in no way commits or binds the Federal Department of Justice, now or in the future.
The following definitions apply in these Regulations.
"Act" means the National Energy Board Act.
"one-call centre" means an organization that, within a defined geographical area, coordinates requests for locates and notifies its potentially affected members of any proposed ground disturbances or excavations for the purposes of protecting their facilities from damage and ensuring public safety.
"pipe" means a line that is used or is to be used for the transmission of oil, gas or any other commodity and that connects a province with any other province or provinces or extends beyond the limits of a province or an offshore area as defined in section 123 of the Act.
"safety zone" means the area extending 30 m perpendicularly from the centre line of a pipe on either side of the pipe.
"working day" means any day that is not a Saturday, a Sunday or any other holiday.
Enacted under subsections 48(2) and 112(5) of the Act.
The safety zone extends thirty (30) metres in both directions from the centreline of a pipe. Figure 1 provides a graphical depiction of the safety zone.
Underground facilities provide essential services and products to their customers and pose a unique hazard to the excavator or ground disturber. Regardless of the hazards, all underground facilities should be treated with great care and protection.
The intent of the safety zone is to ensure:
Persons undertaking construction activities within the right-of-way are required to contact the pipeline company, prior to beginning their work.
Persons undertaking excavation activities within the safety zone or ground disturbance activities within three metres of the centre line of the pipe are required to contact the one-call centre, where one exists, prior to beginning their work. Where there is no one-call centre, the pipeline company should be contacted directly.
Persons planning changes to existing land use or new land use developments near or surrounding existing pipelines should refer to the Canadian Standards Association Guideline entitled CSA Plus 663 Land Use Planning for Pipelines: A Guideline for Local Authorities, Developers and Pipeline Operators.
[3] This proposed text is provided solely for information purposes and in no way commits or binds the Federal Department of Justice, now or in the future.
These Regulations apply to any person that is planning or undertaking an activity that has the potential to damage a pipeline and to any pipeline company.
Enacted under subsections 48(2) and 112(5) of the Act.
The DPR apply to any person planning or undertaking activities that may potentially damage a pipeline. The term "any person" includes, but is not limited to: a landowner, resident, tenant, excavator, contractor, business, and association. These Regulations also apply to all NEB-regulated pipeline companies and their agents.
Damage to pipelines most commonly occurs through direct contact with the pipe during excavation activities and/or when an activity changes the pipe's ambient stress levels.
Did You Know? The stress under which a pipeline operates is determined by numerous factors including the pipe's operating pressure, the strength and the wall thickness of the pipe, the soil type and density, the depth of cover, moisture content of the soil and surface loads on the pipe. Changes to any of these factors may result in damage to the pipe. |
There are many activities that have the potential to damage a pipeline. The following list includes some common activities and events which may interfere with the continued safe operation of a pipeline:
|
|
You should always call the one-call centre (where one exists). Where there is no one-call centre, call individual companies directly to have buried facilities located. |
[4] This proposed text is provided solely for information purposes and in no way commits or binds the Federal Department of Justice, now or in the future.
Section 3 - Members of one-call centre
If a pipeline company has a pipeline within a geographical area where a one-call centre exists, the pipeline company shall be a member of that centre.
Enacted under subsection 48(2) of the Act.
Under the DPR, pipeline companies are required to be a member of a one-call centre where one exists.
As stated in the Ontario Regional Common Ground Alliance Best Practices, Version 4.0 (ORCGA), one-call centres promote the need to "Call Before You Dig" to:
Typical one-call centre activities include:
For further information on one-call centres, pipeline companies may refer to the ORCGA. Copies may be obtained by calling toll free 1-866-446-4493 or through their website. A list of one-call centres is found under Table 1 in section 17, page 29.
[5] This proposed text is provided solely for information purposes and in no way commits or binds the Federal Department of Justice, now or in the future.
Section 4 - Damage prevention program
For the purposes of anticipating and preventing damage to its pipeline, every pipeline company shall develop, implement and maintain a damage prevention program that includes provisions for
(a) ongoing public awareness of the existence of the pipeline and the responsibilities of the public and the company in relation to that pipeline;
(b) ongoing monitoring of the use of the land on which the pipeline is located and the land adjacent to the right-of-way of the pipeline;
(c) ongoing monitoring of any change in the ownership of the land on which the pipeline is located; and
(d) management of the movement of vehicles and mobile equipment across the pipeline.
Enacted under subsection 48(2) of the Act.
Damage prevention programs are intended to reduce the frequency of preventable damage. Although the content of damage prevention programs may vary according to the operations of individual companies, a company's damage prevention program must include elements pertaining to public awareness, monitoring of land use and ownership, and the management of vehicles and mobile equipment across the pipeline.
Damage prevention programs and initiatives are closely tied to requirements found within the NEB's Onshore Pipeline Regulations, 1999 (OPR). Specifically, sections 32 through 35 of the OPR pertain to emergency preparedness and response, continuing education and liaison, and section 39 pertains to monitoring and surveillance. These requirements should also form part of a company's damage prevention program.
The public awareness component is vital to the continued safe operation of pipelines. An effective component should raise the awareness of the affected public and key stakeholders of the presence of pipelines in their communities. It should help the public understand how pipelines function and should also describe the public's responsibilities to help prevent damage to pipelines.
The awareness component should include the following information:
Different audiences should be considered when developing and implementing the awareness component and may include:
The frequency of consultation should be sufficient to ensure that the audience is aware of the presence of the pipeline and the content of the damage prevention programs. The selection of the audience and the frequency of consultation may be based on:
The frequency of contact with audiences should not exceed thirty-six (36) months unless a longer period can be demonstrated to be appropriate.
The awareness component should include provisions for quick communication of essential information to audiences when changes to the pipeline or its operation result in changes to the content of the awareness component.
The content of the awareness component should be conveyed effectively to each target audience on an ongoing basis. Distribution methods could include:
The effectiveness of damage prevention programs should be periodically evaluated as part of the audit program set out within section 12, page 22 of these Guidance Notes.
Awareness of pipeline facilities relies heavily on the use of highly visible markings. Pipeline marker signs indicate that a pipeline is located nearby and provide important information on ownership and emergency response. Signs on facilities and vehicles also increase the public awareness of pipelines.
Mandatory signage requirements for pipelines are provided within clause 10 of the standard Canadian Standards Association Z662-07 Oil and Gas Pipeline Systems (CSA Z662-07).
A combination of above ground and below ground markers should be considered for the identification of underground facilities. Consideration should be given to the installation of below grade markers such as high visibility marker tape at locations where it can reasonably be expected that the pipe will be exposed at some future date (e.g. within road allowances, utility rights of way, at crossings, etc.).
Did You Know? It is against the law to tamper with a pipeline sign. Signs often act as the only surface indication. Tampering with a pipeline sign reduces the likelihood that persons working in that area will be aware that a pipeline is nearby. Pipelines do not necessarily extend in a straight line between the posted signs. |
Above ground markers should:
Pipeline companies should monitor land use and ownership on an ongoing basis through:
Companies must determine whether it is safe to cross the pipeline with vehicles or mobile equipment. In making this determination, companies should determine if the loading imposed by vehicle or mobile equipment is acceptable without mitigative measures or if mitigative measures are required. If mitigative measures are required, companies should determine what those measures are.
As part of the Damage Prevention Program, companies should develop, implement and maintain guidelines for the engineering assessment of surface loading. Companies should apply the guidelines consistently and document their assessments for audit purposes. Engineering Assessments should include consideration of probable loading conditions associated with the current and future land use.
Pipeline companies should also develop, implement and maintain guidelines and service standards for processing requests for the movement of vehicle and mobile equipment consistently and efficiently, which should also provide clear expectations for the public. The guidelines could include:
Pipeline companies should monitor the effectiveness of its guidelines on an ongoing basis. Pipeline companies should maintain records of all crossing requests and responses to requests for audit purposes.
Pipeline companies are encouraged to become members of damage prevention organizations where they exist along their pipeline.
Pipeline companies should be involved in planning and land development processes within the areas in which they operate a pipeline. Where appropriate, pipeline companies should provide submissions to planning authorities outlining their requirements and concerns as well as suggestions on land use whenever proposed land use changes could affect the continued safe operation of their pipeline.
Submissions to planning authorities from pipeline companies should:
Companies responding to development proposals should consider the incremental risks associated with the proposal, and provide any current or future requirements they may have to ensure the continued safe operation of their pipeline and the safety of persons.
Pipeline companies should establish a program for monitoring and surveillance of the right-of-way which incorporates the minimum requirements of the CSA Z662-07. This program should be designed to detect potentially damaging activities that occur on or near existing pipelines.
The frequency of surveillance and monitoring should be proportional to the risk posed in the area (e.g. urban areas, populated centres, frequent ground disturbances, etc.). For more information on surveillance and monitoring refer to the OPR Guidance Notes.
[6] This proposed text is provided solely for information purposes and in no way commits or binds the Federal Department of Justice, now or in the future.
Section 5 - Standards for locates
The pipeline company shall develop, implement and maintain standards for locates of pipelines including
(a) the required qualifications and competencies for locators;
(b) the type and quantity of surface markings to be used;
(c) the procedures for establishing the depth of cover over the pipe; and
(d) the identification to be given to locators.
Enacted under subsection 48(2) of the Act.
Locators must be adequately trained in order to carry out their work. Pipeline companies should develop and maintain training programs and minimum qualification and competency requirements for locators. Additional guidance on training programs for pipeline company employees can be found under section 46 of the OPR. Pipelines companies may also reference the Canadian Association of Pipeline and Utility Locating Contractors for locator technician standards.
At a minimum, locators should:
Companies should identify and mark continuously or at regular intervals the horizontal alignment of their buried facilities using combinations of colour coded surface marks, temporary stakes or flagging. Where possible, markings should indicate the name, initials or logo of the pipeline company that owns or operates the line.
The colours used to temporarily mark the horizontal alignment of underground facilities should be consistent with the American Public Works Association Uniform Colour Code:
| WHITE | Proposed Excavation |
| PINK | Temporary Survey Markings |
| RED | Electric Power Lines, Cables, Conduit and Lighting Cables |
| YELLOW | Gas, Oil, Steam, Petroleum or Gaseous Materials |
| ORANGE | Communication, Alarm or Signal Lines, Cables or Conduit |
| BLUE | Potable Water |
| PURPLE | Reclaimed Water, Irrigation and Slurry Lines |
| GREEN | Sewers and Drain Lines |
Pipeline companies should develop, implement and maintain procedures when establishing the depth of cover over the pipe. The depth of cover over the pipe may be established by either probing or daylighting, depending on the proposed activity and the location of the pipe.
Pipeline companies shall ensure that locators carry identification indicating they have been trained and are qualified to locate specific types of facilities on the company's behalf.
[7] This proposed text is provided solely for information purposes and in no way commits or binds the Federal Department of Justice, now or in the future.
Section 6 - Records of locators
The pipeline company shall create and maintain a record of locators that are qualified to perform locates on behalf of the pipeline company.
Enacted under subsection 48(2) and paragraph 129(1)(d) of the Act.
Training records shall identify persons qualified to locate underground facilities. Documentation of all training must be maintained to ensure that locators have been properly trained.
[8] This proposed text is provided solely for information purposes and in no way commits or binds the Federal Department of Justice, now or in the future.
Section 7 - Ground disturbances
(1) No person shall undertake a ground disturbance, other than one required to comply with paragraph (a), within 3 m of the centre line of a buried pipe unless
(a) a locate request has been made in accordance with subsection 8(1), the surface markings identify the location of the pipe, not more than 30 days have elapsed after the date of the locate report and the location of the pipe has been determined by exposing it, in the presence of the pipeline company's representative, in a manner that does not have the potential to damage the pipe or associated facilities; or
(b) the pipeline company has assessed the effect of the ground disturbance on the pipe and associated facilities and that ground disturbance does not have the potential to damage that pipe or those facilities.
Record
(2) The pipeline company shall create and maintain a record of all exposures referred to in paragraph (1)(a) that are made in the presence of the pipeline company's representative.
Exception
(3) Subsection (1) does not apply with respect to activities referred to in section 112 of the Act.
Enacted under subsection 48(2) and paragraph 129(1)(d) of the Act.
Ground disturbance within three metres of a pipeline must not take place until the pipeline company has been notified and measures have been taken by the pipeline company to ensure that the potential and real impacts associated with the activity have been appropriately mitigated.
Persons undertaking or performing a ground disturbance must request a locate at each proposed site by notifying the pipeline company through the one-call centre or the pipeline company directly. The locate request must be made at least three working days before the day on which the ground disturbance is to start.
The pipeline company must locate its pipe, place surface markings to identify its location and prepare a locate report. The locate report is valid for thirty days.
To avoid causing damage to the pipe and associated facilities, no ground disturbance can take place within three metres of the centre line of the pipe unless the location of the pipe has been determined by exposing it in the presence of a pipeline company representative. Where practical, the pipe must be exposed at sufficient intervals using hand digging or other excavation techniques acceptable to the pipeline company to ensure that the pipe and associated facilities will not be damaged. For additional information on the methods of pipeline exposure, persons planning to undertake a ground disturbance should contact the pipeline company directly. A company representative should also be on site during the backfilling.
Where it is impractical to expose the pipe because of excessive depth, frozen ground or other reasons, alternative methods should be used to ensure that the proposed ground disturbance will not interfere with the continued safe operation of the pipeline. This may include the excavation of a slot trench (an excavation proving the proposed installation will not interfere with the pipeline) over the width of the right-of-way or other techniques which provide equivalent levels of safety. The pipeline company may waive the requirement for exposure where exposure is impractical in its opinion.
Persons undertaking or performing a ground disturbance should abide by the directions of the pipeline company and the terms of any agreements specific to the undertaking.
The pipeline company representative has the authority to stop all activities deemed contrary to the DPR or any agreement in place specific to the undertaking.
Pipeline companies are responsible for determining the necessary requirements for the protection of their facilities during any ground disturbance within the safety zone.
The ground disturber is responsible for ensuring:
The person undertaking the ground disturbance should stop the ground disturbance activities and notify the one-call centre and the facility owners if the markings are removed, altered or are no longer visible.
The pipeline company must carry out such inspections as are necessary to ensure the continued safe operation of the pipeline while activities having the potential to damage the pipeline are occurring. This may include:
Backfill should not include material that could damage facilities.
All ground disturbance activities within three metres of the pipe must be assessed by the pipeline company. If the pipeline company believes the effect of the ground disturbance on the pipe and associated facilities will not cause damage to its pipe or facilities, a pipeline locate and locate report may not be required.
If the pipe and facilities have been determined by exposure, the pipeline companies must document that exposure. Thorough documentation helps ensure that there is an accurate record of the work that was performed. Documentation may include:
[9] This proposed text is provided solely for information purposes and in no way commits or binds the Federal Department of Justice, now or in the future.
Section 8 - Locate request for ground disturbance
(1) The locate request shall be made to the pipeline company, at least three working days before the day on which the ground disturbance is to start,
(a) through a one-call centre if the pipe is within an area where the one-call centre co-ordinates requests for locates; and
(b) through the pipeline company directly if a one-call centre does not exist in that area.
Locates
(2) Within three working days after the day on which the locate request is received, the pipeline company shall, at no cost to the person requesting the locate,
(a) determine if the ground disturbance has the potential to damage the pipe or associated facilities;
(b) locate the pipe and associated facilities and place surface markings to identify the horizontal alignment of that pipe and those facilities to within plus or minus 0.6 m; and
(c) a locate report that includes
(i) a sketch showing the horizontal alignment of the located pipe and associated facilities and, if possible, showing their approximate position relative to readily identifiable objects, and
(ii) sufficient information to enable the person undertaking the ground disturbance to understand the actions and duties necessary for the prevention of damage to the pipe or associated facilities.
Extending period
(3) The period prescribed in subsection (2) may be extended by mutual agreement between the person making the locate request and the pipeline company.
Exception
(4) The pipeline company is not required to undertake the activities prescribed in subsection (2) if the ground disturbance does not have the potential to damage the pipe and associated facilities.
Date of locate report
(5) The locator shall date the locate report.
Enacted under subsection 48(2) and paragraph 129(1)(d) of the Act.
Persons undertaking or performing a ground disturbance must request a locate for each proposed site by notifying the pipeline company through the one-call centre or the pipeline company directly. The locate request must be made at least three working days before the day on which the ground disturbance is to start.
Within three working days after the day on which the locate request was received, the pipeline company must, at no cost to the person requesting the locate:
The Board encourages a pipeline company to respond to a request as soon as possible regardless of the number of days allowed in the regulation.
Stakes or markings may disappear or be displaced. Where delays occur beyond the specified period stated in the locate report or where the locate markings become unclear, a new locate must be requested by the person requesting the locate.
If the surface over the pipe or facilities is to be removed or excavated, supplemental offset markings may be used to clearly indicate the horizontal alignment of the pipe or facilities as determined through the locate.
Prior to undertaking any ground disturbance having the potential to damage a pipeline, the person proposing to perform the ground disturbance should mark out the location or boundary of all proposed activities using markings which are visible and which may be maintained until such time as the ground disturbance is complete. Activities associated with the ground disturbance may not proceed beyond the limits of the markings.
Accuracy of markings shall be within plus or minus 0.6 m measured horizontally from the centreline of the actual pipe or facility.
Unless otherwise specified, locate reports are valid for a period of thirty (30) days after a locate has been completed or until such time as the markings no longer provide clear direction on facility location (whichever occurs sooner).
Locators must communicate the meaning of markings and the information on the locate report to the ground disturber. In addition, the ground disturber should be made aware of the requirements arising from the DPR.
If the pipeline company fails to respond to the person requesting the locate request for a locate, the person requesting the locate should re-call the one-call centre or the pipeline company directly.
[10] This proposed text is provided solely for information purposes and in no way commits or binds the Federal Department of Justice, now or in the future.
When a pipeline company becomes aware of conditions, activities, actions or omissions that might reasonably be expected to cause damage to its pipeline or that might jeopardize the safety of the public or the company's employees in the construction, operation or abandonment of the pipeline, it shall investigate the conditions, activities, actions or omissions and maintain a record of the results of the investigation.
Enacted under subsection 48(2) of the Act.
All conditions, activities, actions or omissions which could reasonably be expected to have caused damage to the pipeline or that might jeopardize the safety of the public or the company's employees should be investigated by the pipeline company as soon as practical. The findings from investigations should be communicated verbally and in written form to all parties involved. A copy of the investigation report should be retained on file by the pipeline company for the life of the pipeline.
The investigation report should contain the following information:
[11] This proposed text is provided solely for information purposes and in no way commits or binds the Federal Department of Justice, now or in the future.
The pipeline company shall immediately report to the Board in writing the results of an investigation if it concludes that the conditions, activities, actions or omissions have caused damage to the pipeline or have jeopardized the safety of the public or the company's employees in the construction, operation or abandonment of the pipeline.
Enacted under subsection 48(2) of the Act.
Pipeline companies shall immediately report their findings of the investigation to the Board, in writing. This documentation should be addressed to the Secretary of the Board and may be filed with the Board by 0X8.
Activities or actions which may have resulted in damage to the pipe include:
Any contact with a pipe, reportable under sections 1 and 52 of OPR, must be immediately reported by the pipeline company to the Transportation Safety Board at (819) 997-7887.
[12] This proposed text is provided solely for information purposes and in no way commits or binds the Federal Department of Justice, now or in the future.
The pipeline company shall develop, implement and maintain an audit program for the purposes of verifying compliance with these Regulations.
Enacted under subsection 48(2) of the Act.
Audits are required under section 53 of the OPR for a number of programs and initiatives pertaining to the design, construction, operation and abandonment of pipelines under the jurisdiction of the NEB. Similarly, the DPR require that companies develop an audit program intended to assess compliance.
Additional guidance on the development of an audit programs can be found in the OPR Guidance Notes.
Consideration should be given to the following when developing an audit program under the DPR:
An audit program may also include:
Audits should be conducted so that the results may be used for benchmarking with previous audits and/or external data when available and appropriate.
[13] This proposed text is provided solely for information purposes and in no way commits or binds the Federal Department of Justice, now or in the future.
Leave of the Board under section 108 of the Act is not necessary to carry a pipeline across a utility other than a navigable waterway or a railway if the terms for the pipeline's construction have been set out in a written agreement between the pipeline company and the owner of the utility.
Enacted under subsection 108(5.1) of the Act.
Where the Board is the appropriate authority under section 108 of the Act, leave (authorization) of the Board is not required if the pipeline company and the utility owner can agree on the terms associated with a proposed crossing.
When a pipeline crosses a utility such as a highway, the right-of-way commonly ceases to exist. The safety zone still applies. However, within the utility crossing area, where there is no right-of-way, the NEB's authority is over the pipeline itself. As such, pipeline companies should ensure that agreements with utility owners provide any necessary protection from facilities placed near the pipeline.
Where no agreement can be reached, the pipeline company may apply to the Board for leave (authorization) under section 108 of the Act.
[14] This proposed text is provided solely for information purposes and in no way commits or binds the Federal Department of Justice, now or in the future.
Section 13 - Construction across, on, along or under pipeline
Leave of the Board under subsection 112(1) of the Act is not necessary for the construction of a facility across, on, along or under a pipeline if the terms for the construction have been set out in a written agreement between the pipeline company and the person planning the construction.
Enacted under subsection 112(1) and 112(5) of the Act.
Persons planning to construct a facility within the right-of-way are required to contact the pipeline company directly and get a written agreement from the pipeline company.
Pipeline companies are responsible for considering and processing all requests by persons wishing to construct a facility.
Refer to section 15 of this document for further information on the "response to a request" to construct a facility within the right-of-way.
Written agreements between the pipeline company and the person planning the construction should include:
If you are unable to reach an agreement with the pipeline company, or you cannot comply with all the terms and conditions in the DPR, you must obtain leave (authorization) from the NEB before starting any construction activities. Refer to section 14 of this document.
[15] This proposed text is provided solely for information purposes and in no way commits or binds the Federal Department of Justice, now or in the future.
Section 14 - Response to request
(1) If a request for an agreement referred to in section 13 is made, the pipeline company shall enter or refuse to enter into the agreement within 10 working days after the day on which the request is received.
Date of receipt of request
(2) The date of the request is the day on which the person making the request gives information to the pipeline company that allows it to adequately evaluate the request.
Extending period
(3) The period prescribed in subsection (1) may be extended by mutual agreement between the person making the request and the pipeline company.
Refusal by pipeline company
(4) If the pipeline company refuses to enter into the agreement, it shall immediately provide the Board and the person making the request with the reasons for the refusal in writing and shall inform the person of their right to seek leave from the Board for the construction of a facility under subsection 112(1) of the Act.
Enacted under subsection 112(5) of the Act.
The pipeline company must approve or deny these requests within ten (10) working days of their receipt. The Board encourages a pipeline company to respond to a request as soon as possible regardless of the number of days allowed in the regulation.
Should the pipeline company deny a request, the pipeline company will immediately provide the Board and the person making the request with the reasons for its denial, in writing and will inform that person of their right to seek leave (authorization) from the NEB.
An application to the Board should include the location and full details of the proposed activity. The Board's Filing Manual provides guidance as to the type of information the Board would typically need in order to make a decision.
The Filing Manual can be accessed online at www.neb-one.gc.ca. Copies of the Filing Manual are also available from the Board's Library by calling 1-800-899-1265.
Applications should be addressed to:
Secretary of the Board
National Energy Board
444 Seventh Avenue S.W.
Calgary, AB T2P 0X8
Applications may be filed with the Board by mail, courier or by facsimile by calling the toll free number at 1-877-288-8803. A copy of the application must be forwarded to the pipeline company so that it can review the information and forward any comments it may have to the NEB.
[16] This proposed text is provided solely for information purposes and in no way commits or binds the Federal Department of Justice, now or in the future.
Section 15 - Excavations outside safety zone
Leave of the Board under subsection 112(1) of the Act is not necessary for excavations outside of the safety zone if the excavations do not have the potential to damage the pipeline.
Enacted under subsection 112(1) and 112(5) of the Act.
Persons undertaking excavation activities outside the safety zone, but within 30 metres extending from the edge of the right-of-way, do not need approval from the Board providing these activities do not have the potential to damage the pipeline.
Even if you are outside the safety zone, if you think the excavation activity may damage the pipeline, you should notify the pipeline company prior to undertaking these activities. By notifying the pipeline company, this will allow the pipeline company to assess the impact of the proposed activities, ensure that the proposed activities will not harm its pipeline and take the necessary steps to ensure the safety of the pipeline.
Examples of activities having the potential to damage a pipeline are provided under the Guidance Notes, in section 2, page 4.
[17] This proposed text is provided solely for information purposes and in no way commits or binds the Federal Department of Justice, now or in the future.
Section 16 - Excavations within safety zone
(1) Subject to subsection (2), leave of the Board under subsection 112(1) of the Act is not necessary for excavations within the safety zone if
(a) a locate request has been made in accordance with section 17;
(b) the pipeline company and the locator have complied with section 18;
(c) the surface markings identify the location of the pipe and associated facilities;
(d) not more than 30 days have elapsed after the date of the locate report; and
(e) in the case of excavations within 3 m of the centre line of a buried pipe, the location of the pipe has been determined by exposing it in the presence of the pipeline company's representative in a manner that does not have the potential to damage the pipe or associated facilities.
Assessed excavations
(2) Leave of the Board under subsection 112(1) of the Act is not necessary for excavations within the safety zone that have been assessed by the pipeline company and do not have the potential to damage the pipe or associated facilities.
Records of assessed excavations
(3) The pipeline company shall create and maintain a record of the excavations that it has assessed and that do not have the potential to damage to the pipe or associated facilities.
Enacted under subsection 112(1) and 112(5) and paragraph 129(1)(d) of the Act.
If an excavation activity is planned within the safety zone, a locate request must be made and the pipeline company must be provided with the opportunity to: assess the impact of the proposed activity, locate its pipeline or associated facilities, place surface markings indicating the location of the pipeline or associated facilities and take whatever steps necessary to ensure that its pipeline is protected from damage.
The excavator/contractor must request a locate at each proposed site by notifying the pipeline company through the one-call centre (refer to section 17), or the pipeline company directly.
Excavation activities must not take place outside the area covered by the locate request without first obtaining a further locate from the one-call center or the pipeline company directly.
Locates are valid for thirty calendar days. Persons planning to undertake excavation activities must not rely on expired locates. A new locate must be made to the one-call centre where they exist, or the pipeline company.
When a pipeline company assesses the impact of a proposed excavation and determines that the excavation may pose a risk to its pipeline, the pipeline company may be required to take necessary steps to ensure the safety of its pipeline, such as:
No activity having the potential to damage a pipeline shall proceed until such time as the continued safe operation of the pipeline can be assured by the pipeline company.
Subsection 16(2) of the DPR is intended to provide the pipeline company with the ability to eliminate locate requests for common and/or frequent excavations which have no potential to result in damage to the pipeline. Such activities could include agricultural tillage or similar activities where the pipeline company is satisfied that the activities can be conducted safely.
The impact of the proposed excavation activities need to be assessed by the pipeline company to ensure that the excavation will not pose a risk of damage to the pipeline. Records of agreement may include:
[18] This proposed text is provided solely for information purposes and in no way commits or binds the Federal Department of Justice, now or in the future.
Section 17 - Locate request for excavations
The locate request shall be made to the pipeline company, at least three working days before the day on which the excavation is to start,
(a) through a one-call centre if the pipe is within an area where the one-call centre co-ordinates requests for locates; and
(b) through the pipeline company directly if a one-call centre does not exist in that area.
Enacted under subsection 112(5) of the Act.
Locate requests must be made at least three working days prior to undertaking excavation activities within the safety zone.
No excavation activities may take place within the safety zone until the pipeline company has completed the locate or determined that there is no need for a locate. If the pipeline company determines there is no need for a locate, this decision should be communicated back to the person planning the excavation.
Anyone undertaking an excavation or ground disturbance activity is required to contact the one-centre to arrange to have the pipeline located. Where a one-call centre does not exist, persons requiring a locate must contact the pipeline company directly.
The following table includes one-call centres within Canada:
| Name | Area Covered | Phone Number | Website |
|---|---|---|---|
| Alberta One-Call | Alberta | 1-800-242-3447 | www.alberta1call.com |
| BC One-Call | British Columbia | 1-800-474-6886 | www.bconecall.bc.ca |
| Sask First Call | Saskatchewan | 1-866-828-4888 | www.sask1stcall.com |
| Ontario One-Call System | Ontario | 1-800-400-2255 | www.on1call.com |
| Info-Excavation | Quebec | 1-800-663-9228 | www.info-ex.com |
| City of Saint John | Saint John, N.B. | 1-800-567-1009 | www.info-ex.com |
[19] This proposed text is provided solely for information purposes and in no way commits or binds the Federal Department of Justice, now or in the future.
(1) Within three working days after the day on which the locate request is received, the pipeline company shall, at no cost to the person requesting the locate,
(a) determine if the excavation has the potential to damage the pipe or associated facilities in the safety zone;
(b) locate the pipe and associated facilities and place surface markings to identify the horizontal alignment of that pipe and those facilities to within plus or minus 0.6 m; and
(c) make a locate report that includes
(i) a sketch showing the horizontal alignment of the located pipe and associated facilities and, if possible, showing their approximate position relative to readily identifiable objects, and
(ii) sufficient information to enable the person undertaking the excavation to understand the actions and duties necessary for the prevention of damage to the pipe or associated facilities.
Extending period
(2) The time period prescribed in subsection (1) may be extended by mutual agreement between the person making the locate request and the pipeline company.
Date of locate report
(3) The locator shall date the locate report.
Enacted under subsections 48(2) and 112(5) of the Act.
Stakes or markings may disappear or be displaced. Where delays occur beyond the specified period stated in the locate report or where the locate markings become unclear, a new locate must be requested by the excavator or contractor.
If the surface over the pipe or facilities is to be removed or excavated, supplemental offset markings may be used to clearly indicate the horizontal alignment of the pipe or facilities as determined through the locate.
Prior to undertaking any excavation having the potential to damage a pipeline, the person proposing to perform the excavation should mark out the location or boundary of all proposed activities using markings which are visible and which may be maintained until such time as the excavation is complete. Activities associated with the excavation may not proceed beyond the limits of the markings.
Accuracy of markings shall be within 0.6 metre measured horizontally from the centreline of the actual pipe or facility.
Unless otherwise specified, locate reports are considered valid for a period of thirty days after a locate has been completed or until such time as the markings no longer provide clear direction on facility location (whichever occurs sooner).
Locators must communicate the meaning of markings and the information on the locate report to the excavator. In addition, the excavator should be made aware of the requirements arising from the DPR.
If the pipeline company fails to respond to the excavator's request for a locate, the excavator should re-call the one-call centre or the pipeline company directly. The Board encourages a pipeline company to respond to a request as soon as possible regardless of the number of days allowed in the regulation.
[20] This proposed text is provided solely for information purposes and in no way commits or binds the Federal Department of Justice, now or in the future.
Section 19 - Operation of vehicles or mobile equipment across pipeline
Leave under subsection 112(2) of the Act is not necessary for the operation of a vehicle or mobile equipment across a pipeline if the pipeline company has assessed the operation and if the operation does not have the potential to damage the pipeline.
Enacted under subsection 112(2) of the Act (leave/permission from the pipeline company).
The movement of vehicles and mobile equipment over a pipeline increases the stresses on the pipe and, in some cases, may result in damage to the pipeline. The actual stress changes can only be assessed through engineering calculations which take into account factors such as:
Prior to moving vehicles or mobile equipment over a pipeline, the pipeline company should:
If permission cannot be obtained by the company, the NEB remains a resource and is available to offer services such as ADR.
CSA Z662-07 contains guidance for the assessment of surface loading effects on pipe.
If necessary, the pipeline company may request that the location of the crossing be moved or reinforced in some manner to prevent damage.
The Proposed Damage Prevention Regulations are based upon and will be promulgated pursuant to the following sections of the National Energy Board Act (the Act):
48.(1) To promote the safety and security of operation of a pipeline, the Board may order the company to repair, reconstruct or alter part of the pipeline, and may direct that, until the work is done, that part of the pipeline not be used or be used in accordance with such terms and conditions as the Board may specify.
(2) The Board may, with the approval of the Governor in Council, make regulations governing the design, construction, operation and abandonment of a pipeline and providing for the protection of property and the environment and the safety and security of the public and of the company's employees in the construction, operation and abandonment of a pipeline.
(2.1) The Board may make orders exempting companies from any or all of the provisions of the regulations made under subsection (2).
(2.2) The Board may make orders exempting companies from any or all of the provisions of the regulations made under subsection (2).
Definitions
108.(1) In this section and sections 110 and 111, "appropriate authority" means
(a) with respect to a navigable water, the Minister of Transport, and
(b) [Repealed, 1996, c. 10, s. 244]
(c) with respect to any other utility, the Board;
"utility" means a navigable water, a highway, an irrigation ditch, a publicly owned or operated drainage system, sewer or dike, an underground telegraph or telephone line or a line for the transmission of hydrocarbons, electricity or any other substance.
(2) The pipeline of a company may, if leave is first obtained from the appropriate authority, be carried across any utility and for that purpose may be constructed on, along or under any such utility.
(3) On an application for leave under this section, a company shall submit to the appropriate authority such plans and profiles and other information as the appropriate authority may require.
(4) On an application for leave under this section, a company shall submit to the appropriate authority such plans and profiles and other information as the appropriate authority may require.
(5) The appropriate authority may provide that leave under this section is not necessary if the pipeline is constructed in accordance with the orders, regulations, plans and specifications made, adopted or approved by the appropriate authority for those purposes.
(5.1) The Board may make orders or regulations prescribing the circumstances in which or conditions under which leave under this section is not necessary to carry a pipeline across a utility other than a navigable water or a railway.
(6) The appropriate authority may grant leave under this section after construction of the proposed work has commenced if the appropriate authority is satisfied that the work was urgently required and, prior to the commencement of construction, the appropriate authority was notified of the company's intention to proceed with the proposed work.
112.(1) Subject to subsection (5), no person shall, unless leave is first obtained from the Board, construct a facility across, on, along or under a pipeline or excavate using power-operated equipment or explosives within thirty metres of a pipeline.
(2) Subject to subsection (5), no person shall operate a vehicle or mobile equipment across a pipeline unless leave is first obtained from the company or the vehicle or mobile equipment is operated within the traveled portion of a highway or public road.
(3) The Board may, on granting an application for leave under this section, impose such terms and conditions as it considers proper.
(4) The Board may direct the owner of a facility constructed across, on, along or under a pipeline in contravention of this Act or the Board's orders or regulations to do such things as the Board considers necessary for the safety of the pipeline and may, where the Board considers that the facility may impair the safe operation of the pipeline, direct the owner to reconstruct, alter or remove the facility.
(5) The Board may make orders or regulations governing
(a) the design, construction, operation and abandonment of facilities constructed across, on, along or under pipelines;
(b) the measures to be taken by any person in relation to
(i) the construction of facilities across, on, along or under pipelines,
(ii) the construction of pipelines across, on, along or under facilities, other than railways, and
(iii) excavations within thirty metres of a pipeline; and
(c) the circumstances in which or conditions under which leave under this section is not necessary.
(5.1) Without limiting the generality of paragraph (5)(c), orders or regulations made under that paragraph may provide for the prohibiting of excavations in an area situated in the vicinity of a pipeline, which area may extend beyond thirty metres of the pipeline, during the period that starts when a request is made to a pipeline company to locate its pipeline and ends
(a) at the end of the third working day after the day on which the request is made; or
(b) at any later time that is agreed to between the pipeline company and the person making the request.
(6) The Board may, by order made on any terms and conditions that the Board considers appropriate, exempt any person from the application of an order or regulation made under subsection (5).
(7) The provisions of sections 49 to 51.3 relating to inspection officers apply for the purpose of ensuring compliance with orders and regulations made under subsection (5).
129.(1) The Board may, with the approval of the Governor in Council, make regulations
(a) respecting the manner in which the accounts of a company shall be kept;
(b) respecting the classes of property for which depreciation charges may properly be included under operating expenses in the accounts and the accounting method or methods that may be used in computing and charging depreciation in respect of each of the classes of property;
(c) respecting a uniform system of accounts applicable to any class of company; and
(d) requiring
(i) companies that have been authorized under Part III to construct or operate a pipeline,
(ii) persons exporting oil, gas or electricity or importing oil and gas, and
(iii) persons holding a licence under Part VI or VII,
to keep and make available to the Board for inspection by the Board or a person authorized by the Board at a place of business in Canada such records, books of account and other documents in such as may be prescribed by the regulations and submit to the Board, at such times and in such form as may be so prescribed, returns and information respecting capital, traffic, revenues, expenses and other matters so prescribed and deemed by the Board to be matters that should be considered by it in carrying out its powers and duties under this Act in relation to those companies and persons.
Protection of Pipeline from Mining Operations
81.(1) No person shall work or prospect for mines or minerals lying under a pipeline or any of the works connected therewith, or within forty metres therefrom, until leave therefore has been obtained from the Board.
Use of oil and gas
(2) Notwithstanding subsection (1), leave from the Board is not required in the case of a well taking oil or gas from lands lying under a pipeline or any of the works connected therewith if the well is not drilled within forty metres of the pipeline.
Application for leave
(3) On an application to the Board for leave to work or prospect for mines and minerals, the applicant shall submit a plan and profile of the portion of the pipeline to be affected thereby, giving all reasonable and necessary information and details respecting the proposed operations.
Terms of leave
(4) The Board may grant the application referred to in subsection (3) on such terms and conditions for the protection and safety of the public as to the Board seem expedient, and may order that such things be done as under the circumstances appear to the Board best adapted to remove or diminish the danger arising or likely to arise from the proposed operations.
Section 81 does not provide the NEB with the ability to make regulations and as such, prospecting for mines or minerals lying under a pipeline or any of the works connected therewith is not governed by the DPR.
Filing information for applications under section 81 of the Act can be found in the National Energy Board Filing Manual, Guide C, Protection of Pipelines from Crossing Activities and Mining Operations (Act section 112 and section 81).
Did You Know? Prospecting (including seismic exploration) and mining operations within forty (40) metres of the pipeline right-of-way require the approval of the Board. Activities associated with prospecting and mining near pipelines require the approval of the NEB when those activities take place within forty (40) metres of a pipeline (see section 81 of the Act). |