National Energy Board Pipeline Crossing Regulations Part I and Part II

The National Energy Board (the NEB or the Board) regulates more than 70 000 kilometres of pipelines throughout Canada under the authority provided to it within the National Energy Board Act. These pipelines operate continuously and safely delivering energy to satisfy the needs of Canadians and export markets.

Pipelines are often invisible. After their initial construction, all that may be left to indicate their presence are signs at fence lines and road crossings or clearings along the pipeline right of way.

The NEB believes that the safety and integrity of Canada's pipelines depend on public awareness and industry involvement. Activities which occur near pipelines and which have the potential to damage pipelines are regulated by the Board in the public interest. Currently, these activities are governed by the National Energy Board Pipeline Crossing Regulations.

2011-08-31
Excavation and Construction Near Pipelines - 2011 (contains National Energy Board Pipeline Crossing Regulations)

Please note that certain documents in this section are available in PDF format. To inquire about receiving these documents in another format, please contact us. If you do not have PDF viewing software, you can download a free PDF viewer from the Adobe® Web site.

PROPOSED DAMAGE PREVENTION REGULATIONS

In August 2010, the National Energy Board published the proposed Damage Prevention Regulations (DPR) in the Canada Gazette, Part I for a 30-day comment period. The Board thanks all stakeholders who submitted comments. In light of the comments received, the Board will not proceed with finalizing the proposed DPR at this time, pending further analysis and consultation with stakeholders. In November, the Board will draw from Members of the Land Matters Group to conduct a workshop to discuss concerns identified in recent submissions.

This will assist the Board in developing a plan to achieve regulatory clarity for its damage prevention framework by 29 February 2012, as communicated in its Action Plan for Safety and Environmental Protection.

PROJECT BACKGROUND
  • 2010-08-14
    The Proposed Damage Prevention Regulations (Proposed DPR) under the National Energy Board Act were published in the Canada Gazette, Part I on 14 August 2010

    The Proposed DPR and the Regulatory Impact Analysis Statement
    are available on the Canada Gazette website under
    "Part I Notices and Proposed Regulations",
    2010-08-14, Damage Prevention Regulations,
    pages 2242 and 2254.

Guidance Notes

Presentations and Documents

KEY PROJECT CONTACTS:

Project Contact: Céline Sirois (celine.sirois@neb-one.gc.ca)

Media Contact: Vicki Barnett (vicki.barnett@neb-one.gc.ca)

ADDITIONAL PROJECT DETAILS

Related NEB Initiatives:

Land Matters Consultation Initiative (LMCI)

  • 2010-12-22
    LMCI Action 1.2 - Approval and Issuance of Exemption Order MO-21-2010 and Guidance for Safe Crossings of NEB-Regulated Pipelines Using Agricultural Vehicles and Mobile Equipment [Filing A27788]
    • Guidance for Safe Crossings of NEB-Regulated Pipelines Using Agricultural Vehicles and Mobile Equipment [Filing A27788]
    • NEB Order MO-21-2010 - An Exemption Order Respecting Crossings by Agricultural Vehicles or Mobile Equipment [Filing A27788]

Regulations in force

Guide and Pamphlet